Grid Interconnection & Substations for Solar & Wind
110kV & 66kV pooling substations, solar park grid evacuation & renewable IPP power integration.
High-Voltage Pooling Substations & Utility Grid Evacuation up to 110kV
Renewable energy IPP developers scrutinize substation voltage class and grid code compliance above all else. Power evacuation requires robust, fault-tolerant 110kV and 66kV pooling substations capable of meeting strict state transmission utility grid codes. DEC's renewable portfolio includes 110kV and 66kV grid pooling switchyards for solar and wind IPP leaders — such as Mayfair Renewable Energy (110kV RON project), Avanti Solar Energy (110kV Shigaon project), and Avanti Renewable Energy (66kV Hausdurga project).
Process Electrification & System Architecture
110kV / 66kV Pooling Substations
Outdoor AIS switchyards with power transformer bays, LA protection, and SCADA monitoring.
Solar Inverter Duty Transformers
Step-up transformer stations connecting inverter outputs to internal 33kV collection networks.
Transmission Line Interconnection
High-voltage overhead line bays, ABT metering, and STU utility inter-tripping protection.
Grid Code Compliance & Control
Power factor control, VAR management, and remote RTU integration for state load dispatch centres (SLDC).
Technical Parameters & Design Standards
Prominent Client Partners in this Sector
DEC Engineering Scope
- ✓ 110kV & 66kV High Voltage Solar & Wind Grid Evacuation Switchyards
- ✓ Power Transformer Erection, Oil Testing, NIFPS & Protection Integration
- ✓ 0.2S Class ABT Tariff Metering & STU Utility Bay Approvals
- ✓ IEC 61850 Substation Automation System (SAS) & SLDC Telemetry
- ✓ POLYVION 33kV Underground Solar Cable Collection Networks
- ✓ Complete Erection, Testing, Commissioning & CEIG Approvals
Developing a Solar or Wind IPP Project?
Send us your grid interconnection point voltage and capacity — our team reviews STU grid code compliance.
Request Technical Proposal110kV & 66kV Substation EPC for Renewable IPPs
Partner with DEC for high-voltage grid pooling switchyards, STU metering approvals, and rapid project commissioning.