Renewable Energy Infrastructure 2022-2023

Avanti Solar Energy Unit Shigaon 110kV Switchyard

πŸ“ Location: Shigaon, Karnataka, India β€” 110kV High-Voltage Solar Pooling Substation Infrastructure at Shigaon

Client Partner
Avanti Solar Energy Pvt Ltd
Execution Mode
Single-Source EPC
Project Overview & Technical Narrative

Executive Engineering Summary

At Avanti Solar Energy Unit Shigaon in Karnataka, DEC executed the 110kV utility grid evacuation switchyard. The substation connects hundreds of solar inverter outputs to the state high-voltage grid with zero curtailment.
βœ“
Comprehensive Delivery

Engineering & EPC Scope of Work

  • 110kV Outdoor AIS Substation Supply, Civil Erection & Commissioning
  • 110kV SF6 Breakers, Disconnectors & Lightning Arresters
  • Main Step-Up Power Transformers & Inverter Duty RMUs
  • POLYVION 33kV Solar Collector Cables & Control Cabling
  • KPTCL Grid Synchronization Approvals & CEIG Inspection
Project Client Partner

Avanti Solar Energy Pvt Ltd

πŸ“ Shigaon, Karnataka, India

2022-2023

Speak to Senior Engineering Team

Planning a similar industrial electrification or substation installation? Consult directly with DEC lead engineers.

Call +91 84477 52245

Partner With DEC on Your Next Plant Electrification

From 132kV/220kV substations to hazardous-area flameproof complexes, DEC provides single-source turnkey EPC accountability backed by 60+ years of proven delivery.