Dalmia Sugar Mill Unit-Jawaharpur 145 KLPD Grain Distillery & Cogeneration Plant Electrical Project
π Location: Jawaharpur, Sitapur, Uttar Pradesh, India β 145 KLPD Grain-Based Ethanol Distillery & Spent-Wash Incineration Cogen Electrification
Executive Engineering Summary
The scope encompassed 33kV outdoor switchyard installation, IS 5571 hazardous-area flameproof (Ex-d) motor control centres for fermentation and distillation, SS304 cable tray routing through corrosive wash areas, spent-wash incineration boiler BOP electricals, and plant-wide POLYVION FRLS cable distribution.
Engineering & EPC Scope of Work
- 33kV Outdoor AIS Receiving Switchyard & Power Transformer Installation
- 145 KLPD Grain Distillery & Spent-Wash Incineration Cogen Electrical Scope
- IS 5571 Certified Flameproof (Ex-d) Switchboards for Alcohol Hazard Zones 1 & 2
- SS304 Heavy-Duty Cable Tray System through Fermentation & Wash House Blocks
- Trisquare Intelligent Motor Control Centres (IMCC) with Microprocessor VFDs
- POLYVION Flame Retardant Low Smoke (FRLS) Armoured Cables Infrastructure
- PESO & Uttar Pradesh Electrical Inspectorate (CEIG) Statutory Clearances
Dalmia Sugar Mills (Unit-Jawaharpur)
π Jawaharpur, Sitapur, Uttar Pradesh, India
Speak to Senior Engineering Team
Planning a similar industrial electrification or substation installation? Consult directly with DEC lead engineers.
Partner With DEC on Your Next Plant Electrification
From 132kV/220kV substations to hazardous-area flameproof complexes, DEC provides single-source turnkey EPC accountability backed by 60+ years of proven delivery.