Distillery & Ethanol Electrification 2023-2024

Radico Khaitan Ltd Unit-Sitapur 330 KLPD Grain-Based Distillery Project

πŸ“ Location: Sitapur, Uttar Pradesh, India β€” IS 5571 Flameproof Safety & Continuous 24/7 Power Distribution for 330 KLPD Ethanol Facility

Client Partner
Radico Khaitan Ltd
Rating / Capacity
330 KLPD Grain-Based Distillery
Execution Mode
Single-Source EPC
Project Client Partner
Radico Khaitan Ltd Logo

Radico Khaitan Ltd

πŸ“ Sitapur, Uttar Pradesh, India

2023-2024
Project Overview & Technical Narrative

Executive Engineering Summary

Distillery and ethanol plants operate under stringent safety protocols due to the presence of flammable alcohol vapors (Zone 1 & Zone 2 hazardous areas classified under IS 5571).

For Radico Khaitan's greenfield 330 KLPD grain-based ethanol plant in Sitapur, UP, DEC executed the complete electrical EPC contract from 33kV grid receiving down to explosive-area motor controls.
Verified Client Entity
Radico Khaitan Ltd Logo

Radico Khaitan Ltd

πŸ“ Sitapur, Uttar Pradesh, India

2023-2024

Speak to Senior Engineering Team

Planning a similar industrial electrification or substation installation? Consult directly with DEC lead engineers.

Call +91 84477 52245

Partner With DEC on Your Next Plant Electrification