Sugar & Cogeneration Electrification 2021-2022

UP State Sugar Corporation (ISGEC) Meerut 132/11kV Switchyard Project

πŸ“ Location: Meerut, Uttar Pradesh, India β€” 132/11kV High-Voltage Grid Export Switchyard Delivered for UP State Sugar / ISGEC

Client Partner
UP State Sugar Corporation / ISGEC Heavy Engineering
Rating / Capacity
High-Voltage Grid Evacuation Substation
Execution Mode
Single-Source EPC
Project Client Partner
UP State Sugar Corporation / ISGEC Heavy Engineering Logo

UP State Sugar Corporation / ISGEC Heavy Engineering

πŸ“ Meerut, Uttar Pradesh, India

2021-2022
Project Overview & Technical Narrative

Executive Engineering Summary

In collaboration with leading process consultant ISGEC Heavy Engineering, DEC engineered, supplied, erected, and commissioned the landmark 132/11kV outdoor grid evacuation switchyard for UP State Sugar Corporation in Meerut, UP.

The project established a high-reliability grid link compliant with stringent UPPTCL transmission standards.
Verified Client Entity
UP State Sugar Corporation / ISGEC Heavy Engineering Logo

UP State Sugar Corporation / ISGEC Heavy Engineering

πŸ“ Meerut, Uttar Pradesh, India

2021-2022

Speak to Senior Engineering Team

Planning a similar industrial electrification or substation installation? Consult directly with DEC lead engineers.

Call +91 84477 52245

Partner With DEC on Your Next Plant Electrification

From 132kV/220kV substations to hazardous-area flameproof complexes, DEC provides single-source turnkey EPC accountability backed by 68+ years of proven delivery.