Sugar & Cogeneration Electrification 2021-2022

UP State Sugar Corporation (ISGEC) Meerut 132/11kV Switchyard Project

πŸ“ Location: Meerut, Uttar Pradesh, India β€” 132/11kV High-Voltage Grid Export Switchyard Delivered for UP State Sugar / ISGEC

Client Partner
UP State Sugar Corporation / ISGEC Heavy Engineering
Execution Mode
Single-Source EPC
Project Overview & Technical Narrative

Executive Engineering Summary

In collaboration with leading process consultant ISGEC Heavy Engineering, DEC engineered, supplied, erected, and commissioned the landmark 132/11kV outdoor grid evacuation switchyard for UP State Sugar Corporation in Meerut, UP.

The project established a high-reliability grid link compliant with stringent UPPTCL transmission standards.
βœ“
Comprehensive Delivery

Engineering & EPC Scope of Work

  • 132kV AIS Outdoor Substation Lattice Structures Erection & Gantries
  • 132kV SF6 Breakers, Current Transformers, Voltage Transformers & Lightning Arresters
  • 132/11kV Main Power Transformer Installation, Nitrogen Purging & Oil Filtration
  • 0.2S Class ABT Metering & Distance Differential Relay Protection Racks
  • Trisquare 11kV In-House Indoor Switchgear Building Interconnection
  • UPPTCL Grid Synchronization Approvals & CEIG Certification
Project Client Partner
UP State Sugar Corporation / ISGEC Heavy Engineering Logo

UP State Sugar Corporation / ISGEC Heavy Engineering

πŸ“ Meerut, Uttar Pradesh, India

2021-2022

Speak to Senior Engineering Team

Planning a similar industrial electrification or substation installation? Consult directly with DEC lead engineers.

Call +91 84477 52245

Partner With DEC on Your Next Plant Electrification

From 132kV/220kV substations to hazardous-area flameproof complexes, DEC provides single-source turnkey EPC accountability backed by 60+ years of proven delivery.